Kusatsu Onsen(retaining wall construction)

RcS method was adopted to reconstruction of retaining wall around Kusatu Onsen Yubatake where hot spring is running.  

The workspace was limited so that large heavy machinery could not be used for this site. However our RcS method has special technique which enable us to construct even with limited construction space by attaching a single stone one by one.

With our methods, we can propose a construction method that meets the customer’s needs.

locationGunma
methodRcS(Standard type)
ordererKusatsu town office
construction period2013
Drain hall
retaining wall
top side view
TOC