Kanda River restration

Kanda river wall restoration was carried out in the section from Shohei bridge to Izumi bridge. This construction is to install natural stone panels on the existing wall(593.8m) in order to create a river landscape for the Tokyo Olympics.

The construction owner’s request was to keep the wall thinner as possible, and our RcS method was perfect solution for them. (Requirement spec was Stone=40mmt, Installation space=10mm)

locationChiyoda, Tokyo
methodRcS(standard type)
ordererTokyo govt.
construction period2019
corner edge
installation of bridge
TOC